EXSHINE Part Number: | EX-RDK-252 |
---|---|
Manufacturer Part Number: | RDK-252 |
Manufacturer / Brand: | Power Integrations |
Brief Description: | KIT REF DESIGN DG CAPZERO |
Lead Free Status / RoHS Status: | Lead free / RoHS Compliant |
Condition: | New and unused, Original |
Datasheet Download: | CAPZero FamilyTOPSwitch-JX Appl NoteRDR-252 Reference Design Report |
Application: | - |
Weight: | - |
Alternative Replacement: | - |
Utilized IC / Part | CAP014DG, CAP002DG, CAP012DG |
---|---|
Supplied Contents | Board |
Series | CAPZero™ |
Secondary Attributes | Surge Testing to EN6100-4-5 Class 4 |
Primary Attributes | Low No-Load Input Power (<5 mW Actual Dissipation) |
Other Names | 596-1313 RDK252 |
Moisture Sensitivity Level (MSL) | 1 (Unlimited) |
Manufacturer Standard Lead Time | 12 Weeks |
Manufacturer Part Number | RDK-252 |
Main Purpose | Power Management, Capacitor Discharger |
Expanded Description | CAP014DG, CAP002DG, CAP012DG CAPZero™ Series Power Management, Capacitor Discharger Evaluation Board |
Embedded | No |
Description | KIT REF DESIGN DG CAPZERO |
Standard Package | 1 |
---|---|
Other Names | 596-1313 RDK252 |
|
T/T (Bank Transfer) Receiving: 1-4 days. |
|
Paypal Receiving: immediately. |
|
Western Union Receiving: 1-2 hours. |
|
MoneyGram Receiving: 1-2 hours. |
|
Alipay Receiving: immediately. |
DHL EXPRESS Delivery time: 1-3 days. |
|
FEDEX EXPRESS Delivery time: 1-3 days. |
|
UPS EXPRESS Delivery time: 2-4 days. |
|
TNT EXPRESS Delivery time: 3-6 days. |
|
EMS EXPRESS Delivery time: 7-10 days. |
- Power Integrations is a leading supplier of high-performance electronic components used in high-voltage power-conversion systems. Our integrated circuits and diodes enable compact, energy-efficient AC-DC power supplies for a vast range of electronic products including mobile devices, TVs, PCs, power tools, smart appliances (IoT), smart utility meters and LED lights.